Follow up while the estimate is still a real job, then close it. There is no published number of touches that works for every trade. A replacement that sits for a week is different from a drain quote from this morning. What you need is a list of what is open and for how long, and a person who either sends the next note or marks the estimate dead.
A stuck-estimates report shows what is open and for how long. Operator, the assistant inside Trades Operator, can find open estimates and draft follow-ups for your approval. The text does not go out because a row exists. You approve it. Bigger jobs sit longer, so the electrical page says follow-up matters more there. The rule is the same for HVAC, plumbing, and electrical. Do not build a separate sequence per trade.
A practical sequence you can defend
- The day you send it, the customer already has the link. Do not send a second copy that hour.
- One follow-up after they have had time to read it. The draft comes from the estimate, not from a generic "just checking in" that does not name the job.
- One more if the job is a replacement and the first note got silence. Then ask, in plain words, whether to close it.
- Close it or book it. An open estimate with no next step is how the found-money check gets large and the office gets cynical.
The estimate follow-up calculator uses counts you type. It does not tell you how many calls to make. Nothing you type is sent.
FAQ
Is three the right number?
Three is a ceiling people can remember, not a law. Two silences on a replacement is enough to ask whether to close it. A same-day service quote may only need one.
Does Operator send the follow-up?
No. Operator drafts it. You approve it. Nothing is sent until you decide.
Where do I see the age of open estimates?
On the stuck-estimates report: what is open, and for how long. The found-money check can size the dollars from a file you already have.
Related
Sizing the pile is money in open estimates. Options on the estimate are three options on one estimate.